Campus Construction Summer 2023

  • 7/10/2023 - 7/17/2023 Fairhaven's sewer pipe repair. Fairhaven resident halls will be closed for Summer quarter. The Child Development Center will remain open during repairs.
     
  • 7/24/2023 - 8/4/2023 High St. crosswalk closed for repairs. This may impact the accessibility to the DAC. All other routes are still accessible.
     
  • 7/31/2023 - 8/4/2023 South College Drive closed for road repairs. Parking lots 12G and 18R will not be accessible. 
     
  • 8/14/2023 - 8/25/2023 Portion of West College Way closed for road repairs. During this time, the road behind the Wade King Rec Center will not be accessible. 

The Department of Parking Resources will be relocating as needed during these projects.

A map of campus with construction areas that are also listed above